National Repository of Grey Literature 4 records found  Search took 0.00 seconds. 
Application of cemented carbide tools from one supplier at the production of components in the conditions of a small engineering company.
Tysoň, Jakub ; Kalivoda, Milan (referee) ; Osička, Karel (advisor)
Through this technical message is made the optimal project of the surfacing tools for the cutting of a concrete component. All conditions for the suggestion are optimalized in the small engineering company CH.W. Service, s.r.o. A problem was solved in conjunction with this company. At elaboration of this message was resulted from the actual conditions in the workroom and the time and technical possibilities in the time of demand on production of the scheduled component.
Effective drilling tools
Šrefl, Martin ; Dvořák, Jaromír (referee) ; Humár, Anton (advisor)
The first part of this bachelor thesis is focused on the basic characteristic of drilling, dividing drilling tools from the point of view of construction and materials. Range of products drills with indexable cutting inserts domestic company Pramet Tools are compared with Range of products international company Sandvik Coromant in the second part.
Effective drilling tools
Šrefl, Martin ; Dvořák, Jaromír (referee) ; Humár, Anton (advisor)
The first part of this bachelor thesis is focused on the basic characteristic of drilling, dividing drilling tools from the point of view of construction and materials. Range of products drills with indexable cutting inserts domestic company Pramet Tools are compared with Range of products international company Sandvik Coromant in the second part.
Application of cemented carbide tools from one supplier at the production of components in the conditions of a small engineering company.
Tysoň, Jakub ; Kalivoda, Milan (referee) ; Osička, Karel (advisor)
Through this technical message is made the optimal project of the surfacing tools for the cutting of a concrete component. All conditions for the suggestion are optimalized in the small engineering company CH.W. Service, s.r.o. A problem was solved in conjunction with this company. At elaboration of this message was resulted from the actual conditions in the workroom and the time and technical possibilities in the time of demand on production of the scheduled component.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.